New Construction Series: Episode 3-Frame Stage
- Stick built roofs are framed piece by piece on site. They offer more design flexibility and can leave more open space in the attic, which is great for storage or vaulted ceilings.
- Truss roofs use pre-engineered triangular frames built off site and set in place with a crane. They go up quickly and consistently, which is why many production builders use them. The trade off is that the webbing inside each truss takes up attic space, so there's usually less space for storage.
Buyer Tip: Never cut or modify a roof truss, even for a future attic project. Trusses are engineered as a complete unit, and altering one can compromise a whole roof.
4. The "Waterfall" and Taping Around Windows and Doors
Windows and doors are some of the most common places for water to sneak into a home, so how they're sealed at this stages matters a lot.
Flashing tape is applied around each opening in a specific order, starting at the bottom, then sides, then top. Each layer overlaps the one below it, like shingles on a roof, so any water that gets behind the siding or brick runs down and out instead of into your walls. That's the waterfall effect.
Buyer Tip: When you visit the frame stage, look at the tape around your windows. You want clean, overlapping layers with no gaps, wrinkles or loose edges.
Why This Stage Matters
Once the insulation and drywall go in, everything you see at the frame stage is covered up for good. It's one of the best times to bring in a third-party inspector and one of the best reasons to have an agent who understands new construction walking the house with you.
Catch up on the series: New Construction Series: Episode 1 , New Construction Series: Episode 2
Categories
Recent Posts

Sherri's passion is to not only guilde her clients through any transaction smoothly, but to also educate her clients every step of the way so that they are able to make the best informed decisions possible!





